Preloader

Loading

image

Dejoy Joseph

Electrical Engineer

Skills and tools

Designing
Management
communication skills

Contact Dejoy Joseph

About me

v  14.5 years of experiencein different phases of Electrical Engineering. Experience includes ConceptDesign, FEED, EPIC of Oil & Gas Plants /platform (Onshore & Offshore), Petrochemical,Power Plants, Industries, Substations etc

v  Responsiblefor design of 220kV/33kV/11kV/6.6kV/415V Substation, HV/MV/LV Powerdistribution systems, Control philosophy, Load Shedding philosophy, Cablesizing ,Power adequacy report and Equipment sizing calculations

v  Designand Development of Single Line Diagrams, Control and Protection Schematics andElectrical Layouts such as Equipment layout, Cable routing layout, Cable traylayout, Cable transit layout, Lighting layout, Earthing Layout, LightningProtection layout etc

v  Hands-onexperience in power system studies including load flow, short circuit, motorstarting and Reactive power compensation study with ETAP modelling software. Experiencein Protection coordination studies using ETAP & Relay setting calculation

v  Preparationof Design criteria / Design calculations and Vendor Engineering review of layoutsand Vendor  document review of Electricalequipment like Transformer,HV/MV/LV Switchgear, Cable, Motor, AC and DC UPS, PMS etc. Carry out necessary technicalstudies to propose optimized technical solutions

v  Preparationof Tender Specification, Datasheet, Material Requisition and Technical Bid Evaluationfor various electrical equipment like Transformer, Switchgear, Cable, Motor etc

v  Technicalreview of bidder proposals,Bidevaluation and Provide Technical recommendations, support procuring team,follow up Vendor and participate factory acceptance testing (FAT) & Reviewreport of various electrical equipment

v  Reviewand comment EPIC contractor engineeringdeliverables and  Vendor drawing /document & Co-ordination between project packages and provide recommendations

v  Familiarwith Electrical standards like IS, IEC, IEEE, API, SHELL DEP and Companystandards of QP, QG, NOC, ORYX GTL, GASCO etc

v  CertifiedGrade 'A' engineer (MMUP / UPDA),Qatar

v  CertifiedProject Management Professional (PMP)from PMI Institute

v  Provideguidance to EPIC Contractor / Sub Contactors / Vendor and resolve the issues

v  ProjectManagement, Project planning and scheduling, Resource Planning, Schedulemonitoring, Risk assessment, Conduct KOM/Meetings, Quality management, Recoveryplans, Client interface and Communication & coordination with EPIC contactors/ Client

v  Engineeringco-ordination with other disciplines, construction, commissioning etc

v  Contributeto Safety analysis studies and ensure compliance to all activities with safetyinstructions and HSE procedures

v  Aneffective communicator with excellent relationship management skills and stronganalytical, leadership, Goodsense of team spirit, decision-making, problem solving ability

Custom Fields

  • NationalityIndian
  • Marital statusMarried
  • Current Salary per Day$400-$699
  • Expected Salary per Day$400-$699

Education

August 2002 -July 2006
Bachelor of Technology
Saintgits college of engineering

Work Experience

May 2017 -Currently working
Senior engineer
Ramboll, Qatar

v  FEED& Detailed Engineering of Offshore platforms and Onshore Oil & Gas plantsin both brownand green field projects.

  • Preparation / Review of FEED documents such as specification, datasheets, SLD, Layout, technical Reports etc.
  • Conduct Offshore & Onshore site visits, Data collection and prepare site survey reports
  • Design / Re-affirm the Sizing & Selection of various Electrical equipment like HV & LV Switchgear, LV transformers, HV & LV cable, Motors, AC /DC UPS system, Power management system (PMS) etc.
  • Modification / replacement / retrofit of existing MV / LV switchgear
  • Preparation of project scope of work, Design Basis memorandum, Enquiry specifications data sheets, MR and TBE
  • Preparation of SLD, Protection SLD, Power & control philosophy / schematic drawings, Equipment layout drawings, cabling layout, Earthing layout, lighting layout etc
  • Responsible to identify the team and plan the design activities to achieve the schedule
  • Performing power system studies using ETAP 18
  • Engineering co-ordination with other internal departments like HSE, Mechanical, Civil and C&I and reviewing the interdepartmental document / drawings / package
  • Support project management team to prepare EPIC scope of work, EPIC schedule, cost estimates & technical dossiers and support management in key decisions making.
  • Project planning and scheduling, Resource Planning, Schedule monitoring, Risk assessment, Client interface and coordination with EPIC contactors and outside parties
  • Provide guidance to EPIC Contractor / Sub Contactors / Vendor and resolve the issues.
  • Participation in Safety Studies HAZID & ENVID and Constructability studies
  • Mentoring the engineers and designers to project requirements

v  Projectsexecuted.

  • Acting Lead Engineer for A location offshore platform activities for FEED-DBN PWM A&B locations Produced Water Management (NOC CFT No.10052768), North oil company (NOC), Al-Shaheen field, Qatar
  • Lead Engineer for FEED for Power Feeder Circuits from Kahramaa New 132/11 kV Substation to Existing HV Switchboard of QP refinery Substations & MIC Substation at QP refinery Mesaieed, Qatar Petroleum
  • Project Manager and Lead Engineer for Replacement of Existing AC UPS and DC UPS in various locations in QATARGAS. (EPIC Contractor: Petrotec & Petrocon)
  • Project Manager and Lead Engineer for Detailed Engineering Services for STG AVR Obsolescence Replacement, EPMS obsolescence Replacement & Kahramaa Incomer Bay Control, Protection, & Telecom Obsolescence - ORYX GTL. (Contractor: QCON)
  • Lead Engineer for Detailed Design and Engineering for EPIC for New HVAC system in QATARGAS-1 Upstream Telecom room and Non plant buildings of Warehouse & Workshop, QATARGAS. (Contractor: TRAGS & MEDGULF)
  • Lead Engineer for Detailed Engineering for Upgrade of Velocity Approach System & Docking and mooring system in Berth 1, Berth 22 & 23, Berth 3,4 & 5, QATARGAS. (Contractor: DESCON and MEDGULF)
  • Senior engineer for FEED in Al Shaheen Field Development (Phase 2, Batch 1) – Well head platforms and bridges, NOC

September 2014 -April 2017
Senior engineer
ETA PPD, Abudhabi

DetailedEngineering & Modification of 33kV & 11kV Substations and Electricalsystems for Oil & Gas Plants(NGL plant)

  • Review of FEED documents such as specification, datasheets, Layout, reports etc.
  • Design and reaffirm the Sizing & Selection of various Electrical equipment like Transformers, STATCOM, 132kV Cable, Capacitor bank, HV & LV Switchgear, LV transformers, MV & LV cable, PMS/ SCS, Bus duct, DC &  AC UPS system etc
  • Prepare the RTQ (Request for technical query) in case of conflicting requirement amongst any of the specification, standard, datasheets, drawings, studies & reports
  • 33kV GIS and 11kV AIS HV Substation design
  • Reactive power Compensation design of 33kV & 11kV capacitor banks and STATCOM
  • Modification / replacement / retrofit of existing HV switchgear
  • Preparation of project scope of work, Design Basis memorandum, Enquiry specifications data sheets, power system studies scope of work and EHAZOP scope of work
  • Technical Bid Evaluation of various electrical equipment
  • Preparation of SLD, Protection SLD, Power & control philosophy / schematic drawings, Electrical Equipment layout drawings, Cabling routing layout, Cabling tray layout, Cable transit details, Earthing layout, Lightning protection layout  Lighting layout  etc
  • Responsible to attend kick off meeting, study contract specification and prepare the project engineering deliverables and schedule in coordination with project manager
  • Prepare engineering document deliverable register (EDDR) and three-week plan look head schedules
  • Ensuring that the vendor information incorporated in engineering deliverables
  • Prepare the site survey reports and finalizing the location of capacitor building, substation building, STATCOM building, Power transformers & cable routing / cable trenches / channels
  • Responsible to identify the team and plan the design activities to achieve the schedule.
  • Instruct / Guide the Engineers and Draftsmen / Designer to achieve the task
  • Responsible to ensure timely availability of approved drawings, specifications to start the activities as per schedule
  • Coordinating and reviewing the power system studies with PSS consultant
  • Engineering co-ordination with other internal departments like Mechanical, Civil and C&I and reviewing the interdepartmental document / drawings / package.
  • Coordinate with various equipment vendors and client
  • Inspection (FAT) of electrical equipment like HV switchgear, LV switchgear, transformers etc
  • Experience of participation in safety studies like eHAZOP (SAFOP)
  • Assisting and guiding the Site Construction team and Commissioning team

v  Projectsexecuted.

  • Acting Lead engineer for Engineering (EPIC) of Gas processing plants under the project code name “POWER GENERATION RETIREMENT PROJECT”forHabshan & BAB gas plants (NGL) of GASCO (Abudhabi Gas industries limited)

December 2009 -August 2014
Senior Engineer
FICHTNER CONSULTING ENGINEERS (I) PVT LTD, IINDIA

v  Basicengineering, FEED, Detailed Engineering and Vendor Engineering Review of Coal based thermal power plants Gas based combinedcycle power Plants (CCPP) and Petrochemical plants

  • Preparation of Detailed Project Report, Due Diligence report, Design Basis Report etc.
  • Sizing of Electrical equipment like Generator Transformer, Unit Auxiliary transformer (UAT), Station transformer, IPBD, Generator Circuit breaker, Emergency DG Set, LV transformers, HT & LT SWGR, NSPBD, UPS, HT & LT cable, DC system etc
  • Preparation of Enquiry specifications documents for total EPC Contract
  • Evaluation of Technical and commercial electrical equipment bid
  • EHV & HV Switchyard / Substation design for Power evacuation
  • Preparation of SLD, Power & control philosophy / schematic drawings, Electrical Equipment layout drawings, cabling layout etc. for power plants
  • Power System studies using ETAP
  • Power plant Earthing and lightning protection system design documents / drawings.
  • Vendor Engineering document / drawing review for total EPC Contract, e-BOP package and Individual electrical & mechanical packages of power plants
  • Inspection of electrical equipment like Generator transformer, UAT, EHV equipment etc.
  • Engineering co-ordination with other internal departments like Mechanical, Civil and C&I and reviewing the interdepartmental document / drawings / package.
  • Coordinate with various package vendors and client
  • Instruct / Guide the junior Engineers and Draftsmen / Designer to achieve the task.
  • Perform Resource planning and monitor resource utilization.

v  Electrical Leadengineer for 225MW Combined Cycle Power Plant (CCPP) SOMA, 1 x 300MWCoal based Thermal Power Plant (TPP) Maruti, 2 x 660MW super critical TPP TPCIL& 2 x 300MW Coal based TPP Jinbhuvish Power

v  Projectsexecuted.

  • Detailed Engineering of 225 MW Combined Cycle Power Plant for SOMA enterprise at Kashipur, Uttaranchal
  • Specification review, Bid evaluation & vendor document review of 2X 660MW Supercritical Thermal Power project at Krishnapatnam, Andhra Pradesh for TPCIL (Thermal Powertech Corporation India Limited)  Hyderabad
  • Vendor Document review and approval of 1 x 300MW coal based TPP for Maruti Coal & power Ltd in Korba, Chhattisgarh
  • Electrical Vendor Engineering Document review of 726.6 MW CCPP at Pallatana, Tripura  for OTPC (ONGC Tripura Power Company )

November 2006 -December 2009
Assistant Engineer
POWER ENGINEERING AND TECHNOLOGY (POET) CONSULTANTS PVT LTD, INDIA

Basicengineering and Detailed Engineering in Primary & Secondary PowerDistribution system for Industries and Substations

  • HV and MV Power distribution system design
  • Outdoor 66kV and 220 kV Switchyard designs
  • Earthing and lightning protection system design
  • Preparation of Key SLD, Power & control schematic drawings, electrical equipments layout drawings, cabling layout, Earthing & lightning protection layout
  • Preparation of Design Basic report , Load lists, electrical equipment bid documents, Technical and commercial bid evaluation
  • Sizing calculation for electrical equipment, Power & Control cables, earthing conductor and reactive compensation at different voltage levels
  • Site coordination during installation and commissioning period

v  ProjectsAssisted

  • Detailed Engineering of Electrical Systems for Cigarette manufacturing Division M/s ITC Ltd., Puna, India
  • Detailed engineering of electrical systems for Automobile Plant #2 at Toyota Kirloskar Motor Bidadi, Bangalore

Awards and Certificates :

October 2017 -October 2023
PMP
PMI 6

Uploading